# Tub-to-Shower Conversion: Permit, Drain and Pan Work

- Business: Dollhouse Construction Inc (CSLB #1045801)
- Phone: (626) 991-8219
- Page: https://dollhouseconstruction.com/blog/tub-to-shower-conversion/
- Last updated: 2026-11-13 (generated from the live site copy at build time)

> Tub-to-shower conversion: what changes in the drain, valve, pan and waterproofing, minimum shower size, glass, and which cities need a permit. CSLB #1045801.

AI concept · not our work
1. [Home](https://dollhouseconstruction.com/)
2. [Guides](https://dollhouseconstruction.com/blog/)
3. Tub-to-shower

Guide · Last reviewed November 2026

# Tub-to-shower conversion: what actually changes

Why taking out a tub and putting in a shower is a plumbing, waterproofing and permit job, with what the codes and city pages say.

[Get a fixed-price quote for my shower](https://dollhouseconstruction.com/free-estimate/)

[Call Dallas: (626) 991-8219](tel:+16269918219)

- CSLB #1045801
- 4.6 from 19 Google reviews
- Dallas answers the phone

By Dollhouse Construction Inc. · Published November 13, 2026 · Sources read November 13, 2026

A tub-to-shower conversion looks like a swap in a photo. In San Dimas, moving plumbing is permit work, and a new valve and drain is not a washer swap. It is not. The drain moves or gets rebuilt, the valve changes, the floor is rebuilt to slope, a waterproof layer goes up the walls, and in the cities we checked this is permit work. The fixture is the small part of the job. The layers behind it are the job.

## Why it is a real job, not a swap

A tub is a bowl that holds water. A shower is a room surface that has to shed it. That one difference drives most of the work:

- **Plumbing.** A different drain, a different valve, often a new rough-in in the wall.**
- **The floor.** A tub sits on the floor. A shower floor is built to slope to the drain.**
- **Waterproofing.** Water hits the walls now, not just a tub deck, so the walls and floor need a continuous waterproof layer under the tile.**
- **Enclosure, air and surfaces.** Glass or a curtain, a fan that vents outside, and tile or another nonabsorbent surface up the walls.**
- **Paperwork.** A permit, and an inspection while the plumbing is still open.**

This matches what our [bathroom remodeling page](https://dollhouseconstruction.com/bathroom-remodeling/) says: new valve and drain, a sloped pan, waterproofing, tile and glass. The rest of this guide opens each piece up.

## Drain and valve: what moves

**The drain.** A tub drain usually sits at one end, under the tub. A shower drain wants to be at the low point of a sloped floor, often near the center. Moving it can mean opening the floor and reworking the waste line. In an older house that is where surprises show up; see [remodeling a 1960s or 1970s home](https://dollhouseconstruction.com/blog/remodeling-1960s-70s-home/).

**The valve.** Covina's bath handout says: "Shower and Tub/shower control valves shall be pressure balancing / thermostatic per CPC 408.4." Glendora's says "All showers and tub-showers shall have a pressure balance, thermostatic mixing valve, or a combination pressure balance/thermostatic mixing type valve," and limits the water at an individual showerhead to 120 degrees F. (Covina Handout #09; Glendora 2025 requirements.) A shower valve usually sits at a different height than a tub valve, so the wall gets opened.

**Showerhead flow.** Both city handouts list a maximum of 1.8 GPM for shower heads. Pick fixtures that meet it.

**What we can't promise from a photo.** Whether your drain can stay where it is depends on what is under the floor. Dallas looks first, then the written quote says what moves.

What this means for your project

Whether your drain can stay put depends on what is under your floor. Dallas looks first, then the written quote says what moves.

[Call Dallas: (626) 991-8219](tel:+16269918219)

[Get my fixed-price quote](https://dollhouseconstruction.com/free-estimate/)

CSLB #1045801 · 4.6 from 19 Google reviews · Dallas answers the phone

## How big does a shower have to be?

**What the code says.** The 2025 California Plumbing Code, section 408.7: "Shower compartments shall have a finished interior in accordance with the following: Not less than 1024 square inches" and "Be capable of encompassing a 30 inch (762 mm) circle." The same section measures the area "at a height equal to the top of the threshold," and an exception covers a receptor with overall dimensions of at least 30 inches wide and 60 inches long. Covina's handout turns it into a number you can tape out: "1024 in2 (32" x 32" finished interior size minimum)." (CPC 2025 section 408.7, third-party reproduction; Covina Handout #09.)

**Why it matters for a conversion.** A standard tub alcove is wider than that. The squeeze comes from what you add: a bench, a niche, a door that swings into the space. Glendora's handout says "Shower doors must not encroach into the required thirty (30) inch circle." (Glendora 2025 requirements.)

**Nearby toilet.** For a toilet, Covina's handout asks for "a total minimum 30" clear space, 15" from the center of the fixture to the wall, and a minimum of 24" clear space in front of the fixture" (CPC 402.5). If the shower sits next to a toilet, check that too. We did not find a shower front-clearance figure in the sources we could open.

**Older code.** The 2022-based Orange County handout words it this way: "Minimum shower size is 1024 square inches (30" circle)." The California plumbing code was updated in 2025, so use your city's current handout.

## Curb or curbless?

A curb is a low wall at the shower edge that holds water in. Curbless means the floor runs into the shower with no step. Both are real options, and both are more work than a tub swap.

**Curb.** The 2025 plumbing code, section 408.6, covers it. A finished dam, curb or threshold "shall be not less than 1 inch (25.4 mm)" lower than the sides and back of the receptor, and "In no case, shall a dam or threshold be less than 2 inches (51 mm) or exceeding 9 inches (229 mm) in depth." Thresholds must be wide enough for "a minimum 22 inch (559 mm) door." (CPC 2025 section 408.6, third-party reproduction.)

**Curbless.** The same page says a shower without a threshold makes the floor space around it a wet location under the building and electrical codes. The 2022-based Orange County handout says the same: "Shower without threshold shall be considered a wet location." For you that means outlets, lights and the room's floor slope get more attention. Curbless also needs the floor framing set lower, which is decided before tile, not after.

**Our plain reading.** A curb is simpler to build and keeps water in without much thought. Curbless is easier to step into and takes more planning. Neither is wrong. Ask which one your floor framing allows.

## The pan and waterproofing: where showers fail

**The pan.** The pan is the sloped floor under the tile. The plumbing code text we read says "The finished floor of the receptor shall slope uniformly from the sides towards the drain." Covina's handout adds: "Site built shower receptors shall comply with CPC 408.8." (CPC 2025 section 408.6; Covina Handout #09.) We could not open the 408.8 text itself, so we do not quote its details here. Ask what your pan is built from and who inspects it.

**The membrane.** Tile and grout let water through. The waterproof layer under them is what keeps the wall dry. TCNA, the tile trade body, lists the standard for these layers: "A118.10 American National Standard Specifications for Load Bearing, [...] Waterproof Membranes for Thin-set Ceramic Tile and Dimension Stone Installation." On its shower FAQ, TCNA describes two of its handbook methods this way: "a waterproof membrane is applied over an unspecified solid backing," and the membrane covers the whole tiled area. (TCNA ANSI Standards; TCNA Showers FAQ.)

**Kinds of membrane, in general terms (our grouping, not from a source above).**

- **Sheet.** A manufactured sheet stuck to the wall and floor, with sealed seams.**
- **Liquid-applied.** Rolled or brushed on in coats, then left to cure.**
- **Foam tray.** A pre-sloped foam base and wall panels, covered with a membrane.**

We do not endorse a brand here. Each system has its own rules for what backer board it goes over and how it is installed. TCNA says the handbook leaves the choice of membrane and backer board combination to the manufacturers and the design professional, and says to check with your local code official. The system is chosen as a whole, and the installer follows that maker's directions.

**Backer board and drywall.** TCNA notes that "Many in the construction industry interpret it to say drywall is strictly prohibited in wet areas." Ask what is behind the tile in your shower, and get the answer in writing. [Our bath page](https://dollhouseconstruction.com/bathroom-remodeling/) shows the layers in the order we build them.

## Glass, wall surface and ventilation

- **Safety glass.** Covina's handout: "Provide tempered glass at tub/shower doors and at windows less than 60" from tub/shower drain." (Covina Handout #09)**
- **Door opening.** Covina's handout: "Stall shower door to open out a minimum of 22" clear wide opening." (Covina Handout #09)**
- **Wall surface.** Glendora's handout: "Bathtub and shower floors, walls above bathtubs with a showerhead, and shower compartments shall be finished with a nonabsorbent surface extending to a height of not less than 6 feet above the floor." (Glendora 2025 requirements)**
- **A fan that vents outside.** Glendora asks for an exhaust fan with a humidistat in a bath with a tub or shower and "minimum 50 CFM intermittent." Covina asks for "50 CFM for intermittent operation." (Glendora 2025 requirements; Covina Handout #09.) Orange County adds that the fan vents "to outdoors in an approved duct." (Orange County handout)**
- **Lights over the shower.** A light inside the shower footprint must, in Covina's words, be "marked as suitable for damp locations, provided with a solid lens and be GFCI protected." (Covina Handout #09)**

If your bath has no fan, or one that ends in the attic, the conversion is the time to fix it. Glass is measured after the tile is done and then made, so it is the last big item to arrive; your written quote has the schedule.

## Do you need a permit? City by city

Short answer: yes in the cities we checked, because the plumbing changes. Each city words it differently. The full list for a whole remodel is in [do you need a permit to remodel in the SGV?](https://dollhouseconstruction.com/blog/remodel-permits-san-gabriel-valley/), and each city page has its own [permit notes](https://dollhouseconstruction.com/service-area/san-dimas/).

- **Covina.** Handout #01 lists "Shower/tub enclosure replacements" under projects requiring permits. Handout #09 says a bath renovation that requires a permit "generally includes but is not limited to the removal and/or relocation of wall framing, sinks, bathtub & showers."**
- **Glendora.** "A permit is required for bathroom remodels that include the removal & replacement and/or relocation of toilets, sinks, tub/showers."**
- **Claremont.** "Plumbing work" is on its permit list. Its cosmetic list names "painting, wallpapering, carpeting, cabinets and interior trim."**
- **San Dimas.** "Plumbing work" is on its permit list. Its exempt list includes "Plumbing repair work such as replacing washers and faucets" and cosmetic work. A new valve and drain is not a washer swap.**
- **West Covina.** "Most any work done to your home requires a permit." (city page, read November 8, 2026)**
- **Azusa.** A permit is required when a structure is "erected, constructed, enlarged, altered." (city page, read November 8, 2026)**
- **La Verne.** No published list we found. The state Residential Code baseline exempts finish work such as painting, papering, tiling and cabinets. Moving a drain and valve is not finish work; confirm with the city.**

Covina and Glendora name this job outright. For the others, "plumbing work" and "altered" are the lines that apply, by our reading. Dallas tells you what your city needs, and permits are pulled for the jobs we build.

## Is a shower safer to step into?

That is often the reason people call. The CDC's data on nonfatal bathroom injuries is from 2008, so it is old, but it says "the most hazardous activities were bathing, showering, or getting out of the tub or shower," and "Approximately two thirds of all injuries occurred in the tub or shower." (CDC MMWR, updated 2011.) It also says only 19% of homes had grab bars, citing a 2004 Home Safety Council report.

The CDC's home fall checklist for older adults is plain: "Put a non-slip rubber mat or self-stick strips on the floor of the tub or shower," and "Have grab bars put in next to and inside the tub, and next to the toilet." (CDC STEADI checklist.)

Two takeaways of ours. If a shower is for safety, ask about a low or no curb and a bench in the plan. And ask about solid backing in the wall for grab bars before the tile goes up. It is far easier then than after.

## Keep one tub in the house?

It comes up every time. The common view among homeowners and agents is that a house is easier to sell to a family if it has at least one tub. We did not find a sourced figure on resale, so we do not give one. Treat it as an opinion worth weighing, not a rule.

- **Two or more baths:** converting the hall bath and keeping a tub in another one is a common plan.**
- **One bath:** think harder. Losing your only tub is a bigger decision.**
- **Staying put for years:** your own use matters more than a future buyer's.**

A local real estate agent is the right person to ask about your neighborhood. For what moves the price of a bath, see the [cost guide](https://dollhouseconstruction.com/cost-guide/), which has no dollar signs.

## Questions we get

### Can I turn a tub into a shower without moving the drain?

Sometimes, if the tub drain lands where the new shower drain can go. A shower floor has to slope to the drain, and that spot is often different from where a tub drain sits, so someone has to look under the floor before anyone promises it. Your written quote states what moves and what stays.

### How small can a shower be?

Covina's bath handout says "Minimum shower size is 1024 in2 (32" x 32" finished interior size minimum)," citing the plumbing code. The code text we read also asks for a space that can hold a 30 inch circle, with an exception for a receptor at least 30 by 60 inches.

### Does a curbless shower need a permit?

In the cities we checked, a tub or shower being removed or relocated is on the permit list, curb or no curb. A curbless shower also changes the rules: the plumbing code text we read says a shower without a threshold makes the floor space around it a wet location. Dallas tells you what your city requires.

### What is a shower waterproofing membrane?

A layer, rated for use under tile, that keeps water in the shower and out of the wall and floor. Tile and grout are not waterproof by themselves. TCNA, the tile trade body, lists the standard for these membranes as ANSI A118.10. Which kind fits your shower is a decision for the written quote.

### Should I keep a bathtub somewhere in the house?

That is a common view among homeowners, not a rule or a number we can source. If you have small children, or a buyer might, one tub in the house is worth thinking about. A local real estate agent knows your street better than we do.

## Keep going

[See our bathroom remodeling page](https://dollhouseconstruction.com/bathroom-remodeling/) · [Get a fixed-price quote](https://dollhouseconstruction.com/free-estimate/)

**More guides:** [Bathroom remodeling](https://dollhouseconstruction.com/bathroom-remodeling/) · [Cost guide](https://dollhouseconstruction.com/cost-guide/) · [How we work](https://dollhouseconstruction.com/how-we-work/) · [Remodel permits in the SGV](https://dollhouseconstruction.com/blog/remodel-permits-san-gabriel-valley/) · [Remodeling a 1960s or 1970s home](https://dollhouseconstruction.com/blog/remodeling-1960s-70s-home/) · [Free estimate](https://dollhouseconstruction.com/free-estimate/)

**Note:** general background, not legal advice or an engineering spec. Codes and city rules change; confirm with your city's building division before work starts.

## Sources

All pages opened and read November 13, 2026, except the two city pages marked November 8. Rules change. Confirm with your city before work starts. Not found in our research: the text of CPC 408.8 (site-built receptors), California Residential Code R307, a drain-size figure, and a sourced resale statistic.

Every source, with the date we read it

### Plumbing code

- California Plumbing Code 2025, section 408.7, Shower Compartments (third-party reproduction on GoCodebook; the official text is published by the California Building Standards Commission): [https://gocodebook.com/library/us/ca/ca-plumbing-code/chapter-4-plumbing-fixtures-and-fixture-fittings/408.7-shower-compartments.-shower-compartments](https://gocodebook.com/library/us/ca/ca-plumbing-code/chapter-4-plumbing-fixtures-and-fixture-fittings/408.7-shower-compartments.-shower-compartments)
- California Plumbing Code 2025, section 408.6, Finished Curb or Threshold (same third-party reproduction): [https://gocodebook.com/library/us/ca/ca-plumbing-code/chapter-4-plumbing-fixtures-and-fixture-fittings/408.6-finished-curb-or-threshold.-where-a-shower](https://gocodebook.com/library/us/ca/ca-plumbing-code/chapter-4-plumbing-fixtures-and-fixture-fittings/408.6-finished-curb-or-threshold.-where-a-shower)
- County of Orange Public Works, Residential Bathroom Remodel Requirements, revised 01/2023, based on the 2022 codes (PDF): [https://pwds.oc.gov/sites/ocpwocds/files/2023-01/2022%20Residential%20Bathroom%20Remodel.pdf](https://pwds.oc.gov/sites/ocpwocds/files/2023-01/2022%20Residential%20Bathroom%20Remodel.pdf)

### Tile and waterproofing

- Tile Council of North America, Showers (FAQ): [https://tcnatile.com/resource-center/faq/showers/](https://tcnatile.com/resource-center/faq/showers/)
- Tile Council of North America, ANSI Standards: [https://tcnatile.com/resource-center/ansi-standards/](https://tcnatile.com/resource-center/ansi-standards/)

### City pages

- City of Covina, Handout #09, Bathroom Remodel (PDF): [https://covinaca.gov/wp-content/uploads/2026/02/09-Handout-Bathroom-Remodel.pdf](https://covinaca.gov/wp-content/uploads/2026/02/09-Handout-Bathroom-Remodel.pdf)
- City of Covina, Handout #01, Do I Need a Permit? (PDF): [https://covinaca.gov/wp-content/uploads/2026/01/01-Handout-Do-I-Need-a-Permit.pdf](https://covinaca.gov/wp-content/uploads/2026/01/01-Handout-Do-I-Need-a-Permit.pdf)
- City of Glendora, 2025 Bathroom Remodel Requirements (PDF): [https://www.cityofglendora.gov/files/assets/city/v/2/community-development/building-division/forms-and-documents/2025-bathroom-remodel-requirements.pdf](https://www.cityofglendora.gov/files/assets/city/v/2/community-development/building-division/forms-and-documents/2025-bathroom-remodel-requirements.pdf)
- City of Claremont, When do I need a permit?: [https://www.claremontca.gov/Business-Development/Building-and-Construction/Building-Permits-and-Plan-Checks/When-do-I-need-a-permit](https://www.claremontca.gov/Business-Development/Building-and-Construction/Building-Permits-and-Plan-Checks/When-do-I-need-a-permit)
- City of San Dimas, When do I need a permit?: [https://www.sandimasca.gov/departments/community_development/building_and_safety/when_do_i_need_a_permit.php](https://www.sandimasca.gov/departments/community_development/building_and_safety/when_do_i_need_a_permit.php)
- City of West Covina, Building Division (read November 8, 2026): [https://www.westcovina.gov/228/Building-Division](https://www.westcovina.gov/228/Building-Division)
- City of Azusa, Building Permits (read November 8, 2026): [https://azusaca.gov/117/Building-Permits](https://azusaca.gov/117/Building-Permits)

### Falls

- CDC, Nonfatal Bathroom Injuries Among Persons Aged 15 Years and Older, United States, 2008 (MMWR, 2011): [https://www.cdc.gov/mmwr/preview/mmwrhtml/mm6022a1.htm](https://www.cdc.gov/mmwr/preview/mmwrhtml/mm6022a1.htm)
- CDC, Check for Safety: A Home Fall Prevention Checklist for Older Adults (PDF): [https://www.cdc.gov/steadi/pdf/steadi-brochure-checkforsafety-508.pdf](https://www.cdc.gov/steadi/pdf/steadi-brochure-checkforsafety-508.pdf)

Planning a tub-to-shower conversion?

## Get a free estimate or call Dallas.

Dallas looks under the floor first, then the written quote says what moves.

(626) 991-8219
Talk to the owner
Link: tel:+16269918219

## Next step

- Free estimate: https://dollhouseconstruction.com/free-estimate/
- Call (626) 991-8219 (Dallas, the owner)
- All files for AI assistants: https://dollhouseconstruction.com/llms.txt
