Your backyard ADU, start to finish.
Feasibility, design, permits and build under one roof. Dallas walks your lot first.

4 ft side and rear setbacks
Four ways to add a second home on your lot.
Which one fits depends on your lot, your garage and what you want it for.

Detached ADU
A new small home in the backyard. State law says the city can't require more than a 4-foot side and rear setback for new ADUs.
HCD, Apr 2026
Attached ADU
Built onto the side or back of your house, with its own entrance.

Garage conversion
Turn the garage into a home. The city can't make you replace the parking if the garage goes.
HCD, Apr 2026
Junior ADU (JADU)
Up to 500 sq ft, built inside your house or attached garage. One per lot. It can share a bathroom with the main house.
HCD, Apr 2026AI-generated concepts, not photos of our work.
Not sure which? That's what the lot check is for.
What would an ADU pay you?
Tell us your budget and the unit you want. We'll show what that budget gets you, the rent it asks in your city, the loan payment, and what's left for your mortgage.
1Your budget What you have to spend, and how
2Your ADU Size and bedrooms drive rent
3Your house Optional, for the payoff math
Assumptions: Rents: Zumper city rent research pages (average asking rent, 30-day listings, Oct 2026), trimmed 3%; 3-bed estimated. Size-for-budget guide: published Los Angeles ADU builder ranges (Apr 2026); attached and junior ADU are estimates. Rates: Bankrate national averages, Oct 7 2026; credit tiers assumed. Vacancy: Northmarq / Marcus & Millichap, 2026. Rules: HCD ADU Handbook, Mar 2026; BOE Pub 800-10. Feature premiums are assumptions. Not tax, legal or lending advice; HELOC rates are variable; your home is the collateral.
Rent of about $2,850 covers the $1,965 interest-only payment and the running costs, with $240 left to put at your mortgage. After the draw period the payment rises to about $2,563, so you'd be $358 short unless you refinance or pay the line down.
What $320,000 gets you Fits your budget
$320,000 comfortably covers about 800 sq ft of detached adu, a 2-bed. You picked 800 sq ft.
Your mortgage, two ways $450,000 at 6.5%

Studio, one-bedroom, two-bedroom.
Your plan is drawn for your lot.
- Drawn in-house, so you see it before it is final
- Sized to your lot and budget, not a catalog
- Floor plan, elevations and site plan
The rules we check before we draw anything.
State law makes ADUs easier to approve. Your city still has rules about size, looks, utilities and fire access. San Dimas's 2025 ADU handout lists the items below. Other cities differ, and rules change, so we confirm the current version with the city and with you on your lot.
San Dimas's handout is the 2025 version; state facts are from HCD's April 2026 fact sheet. Check with the city and with us before you rely on any of this.
From dirt to move-in.
In the order it happens. Inspectors look at the work before it is covered. Your plan sets the exact schedule.

Slab and foundation
Soils report first, then forms, rebar and concrete.

Framing
Walls and roof structure go up. The day it starts to look like a house.

Systems
Plumbing, electrical, gas and air conditioning go in before drywall.

Roof and walls
Roofing, stucco or siding, windows and doors close the building in.

Finish
Drywall, cabinets, flooring, paint, fixtures, final inspection.
Concept illustrations, not photos of our work.
Four phases, one person to call.
Dallas talks you through the whole project before it starts. You always know which phase you're in and what comes next.
Feasibility
Dallas walks your lot. We check setbacks, utilities, soils and fire access, then tell you what fits and what it would take.
We need from you: your address, a rough wish list, any survey you have.
Design
Floor plan, elevations and site plan, drawn in-house. You see it before it's final.
We need from you: your decisions on layout and finishes.
Permits
We assemble the submittal: soils report, plans, energy report, fire approval. The city checks it for completeness within 15 business days, and state law gives the city 60 days to approve or deny a complete ADU application. Fire and utility reviews can add time, so real timelines run longer: LA County ADU permits averaged about 147 days in 2018–22.
We need from you: your signature on forms, and utility details.
Build
Foundation to final inspection with the same crew. Change orders are written, priced and approved by you before work. Then the final inspection, the walkthrough, and the keys.
We need from you: access to the yard and a place for materials.
Sources: HCD ADU Handbook (Mar 2026); Terner Center.
A written price, and payments that follow the work.
One written price
One written, fixed-price quote before work starts. Items cities commonly require, like a soils report or a fire-flow sheet, are named in it.
Payments follow the work
Payments follow finished work. No deposit-and-disappear.
Changes in writing
Changes are written, priced before the work, and approved by you.
Dallas picks up
He answers his own phone.
- Size and type of unit
- Soils and foundation
- How far utilities have to run
- Solar requirement for a new detached ADU
- Fire access on your street
- Finish level
A range is not a quote. The fixed price comes after design.
See what homeowners say about working with Dollhouse, in their own words, on Google.
The worries we hear most.
How big can my ADU be?
San Dimas's handout lists up to 1,000 sq ft. State law says a city can't set the limit lower than 850 sq ft, or 1,000 sq ft if the unit has more than one bedroom. Your lot and budget usually decide before the code does.
Do I need a soils report?
For a detached ADU, San Dimas's handout lists one. It's from a California-licensed geotechnical engineer and its recommendations go into the foundation design.
Can I convert my garage?
Often, yes. The city can't require replacement parking when a garage becomes an ADU. Structure, slab and utilities decide the cost. We check them first.
Do I need solar?
A newly built detached ADU does under the California Energy Code. The panels can go on the ADU or the main house. A conversion or an addition doesn't need them, per the city's handout.
"Will the city say no?"
State law says ADUs are approved by staff against objective rules, not by a hearing, if they meet those rules. That's why we check the rules on your lot before you spend on drawings.
"Will the price jump after I sign?"
You get a written, fixed-price quote before work starts. Anything outside it is a change order: written, priced and approved by you first. Items cities commonly require, like a soils report or a fire-flow sheet, are named in the quote.
"What if you find something underground?"
Soil, old pipes, a sewer line in the wrong place. We stop, show you, give you options and a price, and you decide before we go on.
"Can I rent it out?"
Usually yes. State law lets cities limit short-term rentals, and for certain ADUs any rental must be longer than 30 days. Check your city. We're builders, not tax or legal advisers. Ask yours about rent and taxes.
"Who do I call when something comes up?"
Dallas. He answers his own phone.
Sources (retrieved 2026-10-06): HCD Housing Law Fact Sheet: ADU, April 2026; City of San Dimas, ADU Requirements (2025); City of San Dimas, Homeowner's Guide to the Building Permit Process; HCD ADU Handbook, March 2026; Terner Center for Housing Innovation. Rules change. We re-check on your lot before we quote.

Find out what fits on your lot.
Tell us your address and what you want the unit for. Dallas looks at setbacks, utilities, soils and fire access, then calls you with what works and what it would take. Thinking about rental income? See what an ADU could rent for.