Pay off your house years faster.
A 2-bed ADU in San Dimas asks about $2,850 a month. Rent covers the loan that built it, and what's left goes straight at your mortgage. See your numbers in two minutes.

est. rent $1,978 · interest-only $992
What would an ADU pay you?
Tell us your budget and the unit you want. We'll show what that budget gets you, the rent it asks in your city, the loan payment, and what's left for your mortgage.
1Your budget What you have to spend, and how
2Your ADU Size and bedrooms drive rent
3Your house Optional, for the payoff math
Assumptions: Rents: Zumper city rent research pages (average asking rent, 30-day listings, Oct 2026), trimmed 3%; 3-bed estimated. Size-for-budget guide: published Los Angeles ADU builder ranges (Apr 2026); attached and junior ADU are estimates. Rates: Bankrate national averages, Oct 7 2026; credit tiers assumed. Vacancy: Northmarq / Marcus & Millichap, 2026. Rules: HCD ADU Handbook, Mar 2026; BOE Pub 800-10. Feature premiums are assumptions. Not tax, legal or lending advice; HELOC rates are variable; your home is the collateral.
Rent of about $2,850 covers the $1,965 interest-only payment and the running costs, with $240 left to put at your mortgage. After the draw period the payment rises to about $2,563, so you'd be $358 short unless you refinance or pay the line down.
What $320,000 gets you Fits your budget
$320,000 comfortably covers about 800 sq ft of detached adu, a 2-bed. You picked 800 sq ft.
Your mortgage, two ways $450,000 at 6.5%
The ADU pays for itself. Then it pays your house.
Most homeowners never think past "can I afford to build it?" The real question is what the rent does once it's built.
Your equity builds it
A HELOC or home-equity loan against the house you already own pays for the unit.
A tenant pays the loan
Monthly rent covers the loan payment plus taxes, insurance and upkeep.
The rest hits your mortgage
Extra principal every month shortens the loan and cuts the interest you'd have paid.
Illustration of one approach. Whether to use rent for extra principal, savings or anything else is your call and your advisor's.
Four ways to add a second home.
Which one makes sense depends on your yard, your garage and the rent you're after. Dallas walks the lot first.

Detached ADU
A new small home in the backyard. Highest rent, most privacy, needs the most yard.
Top rent · 2-bed about $2,850/mo
Attached ADU
Built onto the side or back of your house, with its own front door.
Strong rent · 2-bed about $2,765/mo
Garage conversion
The cheapest way in. The city can't make you replace the parking.
Lowest cost · 1-bed about $1,978/mo
Junior ADU
Up to 500 sq ft inside the house. Can be added alongside a full ADU.
Second income · studio about $1,560/moNarrow, square or two-story.


The long one
Runs along a side yard. 1 bed, 1 bath, galley kitchen. For lots with length but no depth.
≈ 550–700 sq ft1 bed

The square one
The classic backyard cottage. 2 bed, 1–2 bath, open living. Highest rent for the money.
≈ 800–1,000 sq ft2 bed

The two-story one
Small footprint, full size. Living downstairs, bedrooms up. For small yards that still want 2 beds.
≈ 900–1,200 sq ft2–3 bedAI-generated concepts, not photos of our work.

Design, permits and build, one person to call.
We design in-house, pull the permits, and build with our own crew. You get one written price and one phone number.
Lot check Free
Dallas walks your yard. Setbacks, utilities, soils, fire access, and which unit makes sense for the rent you want.
Design 6–12 weeks
Floor plan, elevations and site plan drawn in-house. You see it before it's final.
Permits 2–5 months
We assemble the submittal and chase the city. State law sets a 60-day clock once the application is complete; fire and utility reviews add time.
Build 4–8 months
Foundation to final inspection with the same crew. Payments follow finished work. Changes are priced in writing before they happen.
Typical overall: about 8–15 months from lot check to keys. Your plan sets the exact schedule.
From dirt to move-in.





Concept illustrations, not photos of our work.
Your money is safe with us.
One written price
Fixed-price quote before work starts. Items cities require, like a soils report or fire-flow sheet, are named in it.
Payments follow the work
California caps the down payment. You pay as stages finish, never ahead of them.
Designed in-house
Our own design team draws your plans, so the person who designs it is the person who builds it.
Dallas picks up
Owner on site, owner on the phone. Hidden surprises get shown to you with options and a price before anything moves.
See what homeowners say about working with Dollhouse, in their own words, on Google.
What homeowners ask first.
Deciding between a conversion and a new unit? Garage conversion or detached ADU: how to choose.
Can I really rent it out?
Yes. Cities can require leases of 30 days or more (no Airbnb), and a junior ADU must be rented for more than 30 days. Nobody can make you live on site to rent out an ADU.
Can I build two units?
On most single-family lots, state law lets you add one new detached ADU plus one junior ADU (up to 500 sq ft inside the house), and a conversion of existing space on top of that. Two rents, one project.
Will my property taxes jump?
Only the new unit is assessed. Your existing house keeps its current assessment (BOE guidance, 2025). Figure roughly 1.1–1.25% of what the ADU cost, per year, in LA County.
Is there a grant?
Not right now. The $40,000 CalHFA ADU grant was fully allocated in Dec 2023 and no new round has opened. Anyone promising to get you that grant is running a scam.
Do I need a big lot?
No. State law stops cities from setting a minimum lot size, and new ADUs only need 4-foot side and rear setbacks. A two-story unit is allowed up to 16 ft (18 ft near major transit).
How long does it take?
Figure 8–15 months from lot check to keys: design, then permits (the city has 60 days once your application is complete; fire and utility reviews add time), then the build. Your plan sets the exact schedule.
Is this what Dollhouse charges?
No. The calculator shows what your budget can earn: the rent a unit of that size asks in your city, what the loan on your budget costs, and what's left. Your written price comes after Dallas walks your lot.
Sources: Rents: Zumper city rent research pages (average asking rent, 30-day listings, Oct 2026), trimmed 3%; 3-bed estimated. Size-for-budget guide: published Los Angeles ADU builder ranges (Apr 2026); attached and junior ADU are estimates. Rates: Bankrate national averages, Oct 7 2026; credit tiers assumed. Vacancy: Northmarq / Marcus & Millichap, 2026. Rules: HCD ADU Handbook, Mar 2026; BOE Pub 800-10. Feature premiums are assumptions. Not tax, legal or lending advice; HELOC rates are variable; your home is the collateral.
Calculator figures are estimates from published market data. They are not a quote, and not tax, legal or lending advice. Rents are asking averages, not guarantees; a HELOC rate is variable and your home is the collateral.

Turn your backyard into a paycheck.
Send your numbers and Dallas will tell you what actually fits on your lot, what it would take, and what it would rent for. No deposit, no obligation. Want the build process first? See how we build ADUs.