ADU rules in the San Gabriel Valley: what the city must allow

What state law guarantees a homeowner in any city, what your city still gets to decide, and what San Dimas, Glendora, La Verne, Claremont, Covina, West Covina and Azusa actually publish.

  • CSLB #1045801
  • 4.6 from 19 Google reviews
  • Dallas answers the phone

By Dollhouse Construction Inc. · Published · Sources read November 13, 2026

California gives homeowners a short list of ADU rights that no city can take away. Cities can set size limits, but not below 850 sq ft (1,000 sq ft for a unit with more than one bedroom). They can ask for no more than a 4 ft side and rear setback, cannot ask you to replace parking when a garage becomes an ADU, and must approve or deny a complete application within 60 days. Beyond that floor, each city writes its own rules, and the seven cities we serve write them differently.

The state parts below come from HCD, the state housing department. The city parts come from each city's own pages and handouts. Where one did not load or did not say, we say so.

What state law guarantees in every city

HCD's ADU Handbook (March 2026) is the state's plain-language guide to the law. These are the points that matter most to a homeowner:

  • A size floor. A city's maximum "must allow an ADU of at least 850 square feet of interior livable space, or 1,000 square feet of interior livable space for ADUs with more than one bedroom."
  • Narrow setbacks. "A setback of no more than four feet from the side and rear lot lines shall be required for an attached or detached ADU."
  • A decision clock. A city must approve or deny a complete application "within 60 days," and a late answer can mean the application is deemed approved.
  • Staff approval, not a hearing. ADUs are "considered, approved or denied, and permitted ministerially, without discretionary review or a hearing."
  • No replacement parking when a garage, carport or covered parking is converted to an ADU or demolished for one.
  • A JADU. A junior ADU is a unit of up to 500 sq ft inside your house, and an attached garage counts as part of the house for this purpose.
  • Up to three units on a single-family lot. HCD says cities must allow "at least one ADU constructed from existing space, one JADU, and one newly constructed detached ADU." (HCD Handbook)

Size, height and setbacks: the floor, not the ceiling

Size. The 850 and 1,000 sq ft figures are a floor. HCD says state law does not limit a city's authority to adopt "less restrictive requirements," so a city may allow more. A conversion of an existing accessory structure or part of the house "is not subject to unit size requirements" (HCD Handbook).

Height. HCD: "There is no height limit contained in State ADU Law," but a city may not set a limit below 16 ft for a detached ADU on a single-family lot. Within a half-mile of a major transit stop the floor is 18 ft, with 2 more feet for a roof pitch that matches the house. An attached ADU can go to 25 ft or the main house's height limit, whichever is lower. A city must allow two stories if the height limit and the building code allow it.

Setbacks. The cap is 4 ft on the sides and rear. HCD says no setback is required for an ADU made from existing living space or an existing accessory structure, or for a new structure "in the same location and to the same dimensions as an existing structure." A city can apply front setbacks, but they "cannot preclude an ADU of at least 800 square feet."

What this means for your project

State law sets the floor. Your lot sets the answer. Tell Dallas your address and city and he can say what applies before you spend on drawings.

CSLB #1045801 · 4.6 from 19 Google reviews · Dallas answers the phone

How the city has to decide: objective rules and a clock

Objective standards only. HCD defines them: "Objective standards require a uniform benchmark or reference that is knowable by both the permit applicant and the permitting agency prior to the submission of an application." Heights, setbacks and "specified colors or materials" qualify. Subjective wording such as "compatibility with neighboring properties" or "promoting design harmony and balance" may not be imposed.

The clock. HCD's handbook gives two deadlines:

  1. Within 15 business days of receiving an application, the city must tell you in writing whether it is complete. If it does not, the application is "deemed complete."
  2. Within 60 days of a complete application, the city must approve or deny it. A delay you request pauses the clock.

A denial must come with "a full set of comments" from every reviewer, and HCD counts "utilities, and special districts" as reviewers.

A caution, from us: 60 days is the city's decision time for a complete application, not a build schedule. Your written quote has the schedule. Our ADU page walks through the phases.

Garage conversions, junior ADUs and parking

Parking. HCD: parking for an ADU "shall not exceed one parking space per unit or bedroom, whichever is less," guest spaces may not be required, and a city "may not require off-street parking spaces to be replaced" when a garage, carport or covered parking is demolished for an ADU or converted to one.

Units inside existing space. HCD calls a group of ADUs "66323 Units" after the code section that protects them. For these, a city "may not impose development or design standards" beyond the ones the section lists. That includes a converted garage or room, a JADU, and one new detached ADU of up to 800 sq ft with 4 ft setbacks. We compare a conversion with a detached unit in garage conversion vs detached ADU.

JADUs. A JADU must be inside the walls of the single-family house. Detached accessory buildings do not qualify. A JADU can share a bathroom with the house but then needs an interior entrance to the main living area. No parking may be required for a JADU (HCD letter to West Covina, October 8, 2025).

Living there, renting, and short-term rental limits

Owner-occupancy for ADUs. HCD: "a local agency cannot impose an owner-occupancy requirement on any other ADU" apart from ADUs sold separately to a qualified buyer under Government Code section 66341.

Owner-occupancy for JADUs. Different. HCD: "If a JADU has shared sanitation facilities with the primary structure, owner-occupancy will be required." With its own bathroom, it is not required.

Rentals. A city may require that ADUs and JADUs be rented for terms longer than 30 days, and HCD says JADUs "cannot be used as short-term rentals." So a weekend-rental plan depends on your city's ordinance. We do not give rent or tax advice. Ask your city, and a tax professional.

What your city still controls

State law sets floors and caps. Inside them, expect these items.

  • Objective design standards. Glendora's handout, for example, lets a unit meet objective design standards or use a preapproved plan. Azusa's ordinance sets an entrance and window rule.
  • Utility hookups. For a new ADU, HCD says "a new or separate connection directly from the utility to the ADU or JADU may be required." Conversions inside existing space cannot be required to install one. San Dimas's handout wants the ADU's sewer tied into the main house's building sewer and a minimum 100A panel.
  • Impact fees above 750 sq ft. HCD: none for an ADU of 750 sq ft or less (500 sq ft for a JADU). Above that, fees are "charged proportionately" to the size of the ADU against the main house. Ask the city for the current schedule.
  • Fire. HCD: sprinklers can be required "only when sprinklers are required for the existing primary residence." In fire hazard zones, the Wildland-Urban Interface code applies. San Dimas's handout also requires a fire-flow and hydrant sheet before the permit is issued.
  • Soils and drainage. San Dimas's handout lists a soils report from a California-licensed geotechnical engineer for the new structure.

Solar on a new detached ADU

This one comes from the Energy Code, not the city. HCD: newly constructed detached ADUs "are subject to the California Energy Code requirement" to provide solar, and the panels can go on the ADU or the main house. ADUs built within existing space, or as additions, are not subject to it. The California Energy Commission's ADU FAQ says: "Adding new PV modules to an existing PV system will satisfy the PV requirements" if the modules are on the same lot. San Dimas's handout adds that existing panels do not offset the requirement.

What each of the seven cities publishes

Each entry is what we read on the city's own site. Some documents are older than the latest state law, and HCD told West Covina in October 2025 that its ordinance on file "may be outdated." Treat every number as a question to confirm.

  • San Dimas. We did not find a dedicated ADU page on sandimasca.gov. The Building and Safety Division publishes a 2025 ADU Requirements handout: maximum 1,000 sq ft, a 4 ft side and rear setback, a soils report, solar for a new detached ADU, fire-flow approval, a new address (yours plus the letter A), and washer and dryer hookups. It also says the ADU must match the main house's style.
  • Glendora. The city has an ADU, JADU and SB 9 page and an ADU handout (revised April 2025, which we read). It lists a 1,200 sq ft maximum, 4 ft side and rear setbacks, 25 ft height, no replacement parking for a converted garage, and owner-occupancy for a JADU. It points to Municipal Code section 21.04.040 and lists two preapproved ADU plans. The page now lists a newer handout that we could not open.
  • La Verne. The city site is laverneca.gov. Its Planning Applications page lists an "Accessory Dwelling Unit (ADU) Guide, Checklist & Fees." The guide names Municipal Code Chapter 18.120 as the ADU ordinance and says completeness is decided within 30 calendar days. State law says 15 business days, so ask which clock the city uses. We could not open Chapter 18.120 itself, so we are not quoting its size or height limits.
  • Claremont. The page lists ADU sizes of 150 to 1,000 sq ft, a 4 ft setback, 16 ft maximum height, JADUs of up to 500 sq ft, and "Only one ADU is permitted per single-family residential lot (along with one JADU)." Ask how the city treats the state's three-unit combination.
  • Covina. The ADU page says you "need to first obtain ADU approval from the Planning Division," before building plan check, and names Chapter 17.69. Its Pre-approved ADU Program reads "Under Construction – Coming Soon!" An ordinance Covina adopted on December 2, 2025 (a scanned copy on the city's code site) sets 850 sq ft for a studio or one-bedroom and 1,000 sq ft for two or more bedrooms, applies no impact fees under 750 sq ft.
  • West Covina. The ADU page and a one-page guideline sheet (updated 05/2025) list one ADU and one JADU per lot, a 4 ft side and rear setback, a 16 ft height limit, a 1,000 sq ft attached or 1,200 sq ft detached maximum, and no separate address or utility connection.
  • Azusa. Ordinance No. 2024-08, adopted December 2, 2024, amends Municipal Code 88.42.190. It repeats the 60-day approve-or-deny rule, sets 850 sq ft (studio or one bedroom) and 1,000 sq ft (two bedrooms) under its general standards. A Building Division checklist still posted on the site, with a file name dated May 2022, shows different numbers (1,200 sq ft, 10 ft separation). Ask which one the city applies.

Where a handout and the state handbook disagree, we ask the city in writing which one applies to your lot. For permits on other remodel work, see remodel permits in the SGV.

A note on the code section numbers

If you read older articles, they cite Government Code 65852.2. HCD's handbook says SB 477 (Chapter 7, Statutes of 2024) renumbered the ADU and JADU law: "Government Code sections related to ADU and JADU law were updated from 65852.2, 65852.22, 65852.23, and 65852.26 to Government Code sections 66310-66342." It took effect in March 2024. We read this in HCD's handbook, not on the legislature's site, which did not load for us.

Questions to ask the planner before you design

  • "Which ordinance and which handout apply to my lot today?" Ask for the date of each.
  • "What is the maximum size here, and does my lot's coverage limit shrink it?" The state protects 800 sq ft.
  • "Do you require a soils report, a fire-flow sheet or solar for this type of unit?"

Dallas walks your lot first and checks these items before anyone draws. Start on our ADU page, or ask for a written estimate, or call Dallas at (626) 991-8219.

Questions we get

How big can my ADU be?

State law says a city's maximum size must allow at least 850 sq ft, or 1,000 sq ft if the unit has more than one bedroom. Your city can set a higher limit, and several of the seven cities do. Converting an existing garage or accessory building is not subject to unit size requirements (HCD ADU Handbook, March 2026).

Can the city turn me down because the ADU does not fit the neighborhood?

Not on that ground. HCD says ADUs are approved ministerially, "without discretionary review or a hearing," and that wording like "compatibility with neighboring properties" is subjective and may not be imposed. A city can still apply objective standards, such as a height, a setback or a stated color or material.

Do I have to live on the property?

For an ADU, HCD says a city cannot impose an owner-occupancy requirement, except on a narrow category of ADUs sold separately to a qualified buyer. For a junior ADU (JADU) that shares a bathroom with the main house, owner-occupancy is required.

Can I rent the ADU by the weekend?

A city may require that an ADU be rented for terms longer than 30 days, and a JADU cannot be a short-term rental under state law. Azusa, Covina, Glendora and West Covina each state a 30-day minimum in their own documents. Check your city's rule before you plan around it.

If I convert my garage, do I have to build new parking?

No. HCD says a city "may not require off-street parking spaces to be replaced" when a garage is converted to an ADU. Glendora's handout says the same for its conversions. For a converted garage, the structure and the slab are usually the real questions. We look at them on your lot.

Note: general background, not legal advice. ADU law changes often; confirm with your city's planning staff before you design or spend anything.

Sources

All pages opened and read November 13, 2026. Rules change. Confirm with your city before you rely on any number here.

Every source, with the date we read it
Thinking about an ADU?

Get a free estimate or call Dallas.

A free estimate starts with a conversation, and a written quote comes after someone has seen your lot.

(626) 991-8219Talk to the owner

Get your free estimate

Two required fields. Dallas or his team will reach out to you directly. No pressure, no obligation.

CSLB #1045801 · We use your details to respond to your request. Unless your browser sends Global Privacy Control, a scrambled (hashed) version of your email or phone, plus your IP address and browser type, may go to Meta to measure our ads. Privacy and ad choices

Call nowFree estimate