A fixed-price remodel quote is a written price for a defined job. In California, the contract has to carry that price, a payment schedule, and a license number. The price changes only through a written change order that you and the contractor both sign before the work changes. The down payment is capped by law. And payments cannot run ahead of the work done.
That is CSLB's own checklist. CSLB is the state board that licenses contractors. You can run the checklist on any bid, ours or anyone else's. Read the whole contract. Never sign one with blanks in it. Look up the license at cslb.ca.gov before you sign.
Estimate, quote, fixed price: what each word means
What CSLB says. CSLB's consumer guide: "All contracts must include the agreed-upon price. By law, the job must be completed for the agreed-upon contract price." CSLB defines the term itself: "A fixed-price contract lists the full agreed upon price for the project." (That definition is on CSLB's Disaster Help Center, a page about wildfire rebuilding. The definition is general; the rules around it on that page are for disaster work only.)
Time and materials. CSLB says contractors may not use "time and materials" or "cost plus" contracts for disaster-related home improvement work.
Plain-English reading (ours, not a legal definition). Words on a bid mean less than what the signed paper says. Check three things:
- Does the document list one full price?
- Does it tie that price to a written description of the work and materials?
- Does it say the price changes only by a signed change order?
If all three are yes, you have what CSLB calls a contract with an agreed price. If the paper says "approximately," "starting at," or bills by the hour, ask what happens when the real number lands above it.
What a California remodeling contract must include
CSLB's guide says home improvement projects above a minimum size must be in a written contract. CSLB sorts contract items into "must" and "should." We keep its split.
CSLB says the contract must have
- An agreed price. (CSLB consumer guide)
- A payment schedule. "A home improvement contract must include a payment schedule." It shows each payment and what work, materials or services that payment covers. (guide)
- The right to cancel, in writing. The contract must be "legible, easy to understand, and inform you of the right to cancel or rescind the contract." (CSLB, What Should I Look for in a Contract and Binding Agreements?; guide)
- A Mechanics Lien Warning. "Contractors are required to give consumers a 'Mechanics Lien Warning.'" (guide)
- A notice about the CSLB. "A Contractors State License Board Notice must be included that explains the Board's role if there is a dispute." (CSLB, Nailing Down Home Improvement Contracts)
- Change-order language. Any change to the contract needs a written, signed change order. (guide; see change orders)
- Workers' compensation information if the contractor has employees. (Nailing Down)
CSLB says the contract should have
- A detailed description of the work. Who does it, what materials, where, when, and for how much. CSLB wants materials listed by "style, brand, model, quality, quantity, weight, color, size." Its own example: "Install upper and lower maple kitchen cabinets, manufactured by Company XYZ, model 01381A" beats "install kitchen cabinets." (guide)
- When the job begins and ends. (guide) CSLB's What is a Contract? page adds that the contract "must provide a date of completion."
- Who pulls the permits. CSLB's checklist also asks: "Are the permit fees included in the contract price?" (guide)
- The contractor's license number, address and phone number. (guide)
- Cleanup and debris removal, and any special requests, such as saving materials or appliances. (guide)
- Warranties in writing, which parts of the work they cover and for how long. (guide)
The three-day cancel right. CSLB's guide says the buyer gets three business days (five if the buyer is 65 or older) to cancel. You give the contractor written notice. The contractor must return any money paid within 10 days of getting it. It does not apply if the contract was negotiated at the contractor's place of business.
Check the license first. CSLB's License Check page lets you search by license number, business name, or the name of a person on the license. It is for checking license "status" and "complaint disclosure." Ours is CSLB #1045801.
What this means for your project
Every Dollhouse quote is written, itemized and fixed, with the payment schedule and our license number on the paper. Ask Dallas for one and run this checklist on it.
CSLB #1045801 · 4.6 from 19 Google reviews · Dallas answers the phone
The down payment rule
CSLB's guide: "the down payment cannot be more than $1,000 or 10 percent of the contract price, whichever is less, for a home improvement job or swimming pool, excluding finance charges. There are no exceptions for special order materials."
That is a cap, not a target.
One exception. CSLB says a handful of licensees with a blanket performance and payment bond on file are exempt, and that these exceptions are noted on its website. If a contractor says they are exempt, ask for the bond details and confirm with CSLB at (800) 321-2752 before you pay.
If a contractor asks for more up front
- Do not pay it on the spot. CSLB's rule has "no exceptions for special order materials."
- Ask for the payment schedule in writing. CSLB: "Only pay as work is completed, not before."
- Check the license and complaint disclosure at cslb.ca.gov.
- If they say a bond exempts them, ask for the details, then confirm with CSLB.
- Call CSLB at (800) 321-2752, or walk away.
What a change order is and when you should see one
A change order is a written change to your contract. CSLB: "If the contract price needs to be changed, it MUST be done with a written 'Change Order,' signed by the customer and contractor prior to the change." Once signed, it becomes part of the contract. (CSLB, What is a Contract?; guide) CSLB's list of required notices adds that "Extra Work" or "Change Order Work Notice" documents "are required for any changes to the original contract, and need to be signed by all parties."
You should see a change order when
- You ask for something new or different, such as a moved sink or a swapped material.
- The job turns up something nobody could see before the walls were open.
- A city inspector requires something that was not in the plan.
What a good one shows: what is changing, why, the price change, the schedule change, and both signatures. (Our suggested list, not a CSLB-required form.) CSLB's advice: "Always update your contract."
What to refuse: extra work done on a handshake, with a bill at the end.
Payment schedules that protect you
CSLB's guide says the schedule "should show the amount of each payment and explain what work, materials or services are to be performed for that particular payment," and that payments "cannot exceed the value of the performed work." How that plays out job by job, with lien releases and the final payment, is its own guide: paying for a remodel in California.
Red flags
Each of these comes from CSLB's guides.
- A bigger down payment than the cap allows. (See the down payment rule.)
- Payments ahead of the work. CSLB: "Never sign any contract or change order that requires a progress payment larger than the value of the work completed."
- No payment schedule, or one tied to dates instead of finished work.
- A blank or partly blank contract. CSLB: "Never sign a blank or partially blank contract."
- Verbal promises. CSLB: "If you are promised something verbally, make sure that it is also included in writing."
- Vague scope. CSLB's "trouble ahead" examples: "Install maple kitchen cabinets," "Replace kitchen faucet, if necessary." Its worst case: "Install some cabinets."
- No license number on the paper, or one that does not check out at cslb.ca.gov.
- No lien warning, cancel notice or CSLB notice in the contract.
- A salesperson who is not registered. CSLB: a salesperson cannot sign a home improvement contract for the contractor unless they are a registered Home Improvement Salesperson. The License Check page also searches registrations.
- A contract that does not say who pulls the permits. (CSLB checklist.)
How Dollhouse writes a quote
Short, because the rules above apply to us too.
- Your quote is written, itemized and fixed. The work by phase, the materials, what is included and what is not.
- Changes happen only in writing, with your OK first. See how change orders work.
- The payment schedule is in the contract.
- Our license number is in the contract. CSLB #1045801. Check it yourself at cslb.ca.gov.
- Who pulls the permits is in the contract.
Full process, from first call to final walkthrough: how we work. What moves the number on a kitchen or bath: cost guide. Permits by city: do you need a permit to remodel in the SGV? Older homes and what the walls can hide: remodeling a 1960s or '70s home. Other questions: FAQ.
Get a written, fixed-price quote or call Dallas at (626) 991-8219.
Questions to ask before you sign
- "Where is the payment schedule, and what finished work triggers each payment?" Payments cannot exceed the work done.
- "What is the down payment, and is it within the legal cap?" Ask for the number in writing.
- "Who pulls the permits, and are the fees in the price?" The contract should say.
- "How do you handle a change, and when do I sign?" The answer should be: in writing, before the work.
- "Can I look up your license now?" Do it on your phone at cslb.ca.gov while they are at the table.
Questions we get
What is a change order?
A written change to your contract. CSLB says a price change must be done with a written change order, signed by the customer and contractor before the change. Once signed, it becomes part of the contract. Keep a copy with your other project paperwork.
Can a California contractor ask for half the job up front?
Not under CSLB's down payment cap, which has no exception for special-order materials. A handful of contractors with a blanket performance and payment bond on file are exempt. If someone claims that, ask for the details and confirm with CSLB before you pay.
Is an estimate the same as a fixed-price quote?
What binds you is the signed contract. CSLB says the contract must include the agreed price and the job must be completed for it. Ask for the full price, the scope and the payment schedule on the same signed paper.
Can I cancel after I sign?
Often. CSLB's guide gives three business days (five if you are 65 or older) to cancel in writing, with money returned within 10 days. It does not apply if the contract was negotiated at the contractor's place of business.
How do I check a contractor's license?
Go to cslb.ca.gov and open License Check. Search by license number, business name or the name of a person on the license. It shows license status and complaint disclosure. Ours is CSLB #1045801.
Note: general background, not legal advice. Rules change; confirm with CSLB before you sign anything.
Sources
All pages opened and read November 6, 2026. Rules change. Confirm with CSLB before you sign anything.
Every source, with the date we read it
- CSLB, A Consumer Guide to Home Improvement Contracts (PDF): https://www.cslb.ca.gov/resources/GuidesAndPublications/HomeImprovementContractsConsumerGuide.pdf (read November 6, 2026)
- CSLB, Nailing Down Home Improvement Contracts, Consumer Education Series (PDF): cslb.ca.gov, Resources, Consumer Education, NailingDownHomeImprContracts.pdf (read November 6, 2026)
- CSLB, What is a Contract?: https://www.cslb.ca.gov/consumers/hire_a_contractor/Home_Improvement_Contracts/What_Is_A_Contract.aspx (read November 6, 2026)
- CSLB, What Should I Look for in a Contract and Binding Agreements?: https://www.cslb.ca.gov/consumers/hire_a_contractor/Contracts_And_Binding_Agreements.aspx (read November 6, 2026)
- CSLB, Disaster Help Center (used only for the fixed-price definition and the disaster-work contract rule; disaster-only rules are not applied to ordinary remodels here): https://www2.cslb.ca.gov/Media_Room/Disaster_Help_Center/ (read November 6, 2026)
- CSLB, License Check: https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx (read November 6, 2026)
- CSLB, written statement on home improvement contract requirements (regulation text, PDF): https://www.cslb.ca.gov/Resources/LawsAndRegulations/2022/CCR858.2Sec100WrittenStatement2022_09.pdf (read November 6, 2026)


