A building permit is not always the first approval. If you live in an HOA, there is a design review before the city sees your plans. If the work is on the outside of the house, the city's planning staff may want to look first. If the house is old and listed, there can be a preservation review on top. People find out about these late, usually after the drawings are done.
This guide covers what we could confirm from the state code, HCD and three city pages. Our remodel permits guide covers the building permit itself. Where a source did not say something, we say so.
The order: HOA, then Planning, then Building
These are three different offices with three different jobs, and none of them signs for the others.
- HOA first, if you have one. San Dimas says it directly: if your neighborhood has an HOA, "you'll need to get their approval stamp on plans before submittal to City." (San Dimas Plan Checking)
- Planning second, where the city has a design or preservation review. Azusa says to finish Design Review before applying for the building permit. Claremont describes a preservation review for listed historic resources. (Azusa Building Permit Process; Claremont Cultural Resource Preservation)
- Building third. Plan check, permit and inspections. See remodel inspections explained.
A city permit does not replace an HOA approval, and an HOA approval does not replace a permit. We pull the permits on the jobs we build. The HOA application is yours to file, and we can supply the drawings and material details it asks for.
What the Davis-Stirling Act says about HOA design review
California's rules for HOAs and similar communities sit in the Civil Code. Section 4765 applies if the HOA's governing documents "require association approval before a member may make a physical change" to your home or the common area. If yours do, the HOA has to follow rules about how it decides. (Civil Code 4765)
- A written procedure with deadlines. It must be fair and reasonable, "shall provide for prompt deadlines," and must "state the maximum time for response to an application." Ask your HOA for the procedure and the deadline before you apply.
- Good-faith decisions. Decisions cannot be "unreasonable, arbitrary, or capricious."
- Law still applies. A decision cannot violate fair housing law, building codes or other land-use and safety laws, whatever the governing documents say.
- A written decision. "A decision on a proposed change shall be in writing." If it is a no, the writing has to explain why and say how to ask the board to reconsider.
- Reconsideration. A disapproved applicant can ask the board to reconsider at an open board meeting, with an exception where the board itself already decided at a compliant meeting.
- Yearly notice. The HOA must tell members each year which changes need approval and include the review procedure.
Those are the state's minimums. The actual list of what needs approval, and what a good application looks like, is in your own governing documents (CC&Rs), which we have not seen. HCD defines CC&Rs as "a set of rules governing the use of a certain piece of real estate in each community." (HCD ADU Handbook)
What this means for your project
Which approvals come before the permit depends on your city, your HOA and what the work touches outside. Dallas can tell you the order for your address.
CSLB #1045801 · 4.6 from 19 Google reviews · Dallas answers the phone
What an HOA cannot block: ADUs and solar
ADUs. Civil Code 4751 voids a covenant, restriction or condition in a deed, contract or governing document that effectively blocks or unreasonably limits an ADU or junior ADU on a lot zoned for single-family use, calling it "void and unenforceable." HCD's handbook asks the question plainly: "Can CC&Rs prohibit the construction or use of an ADU or JADU? No." (Civil Code 4751; HCD ADU Handbook)
Reasonable restrictions survive. HCD says an HOA "may impose some limited objective standards," such as specific materials, styles "or other design and aesthetic restrictions," as long as they are not "more stringent than State ADU Law." Reasonable restrictions "shall not include any fees or other financial requirements." (HCD ADU Handbook, citing Civil Code 714.3)
HCD also says that if you run into a prohibition in the CC&Rs, you are "encouraged to reach out to their local agency." For the unit itself, see ADU rules in the San Gabriel Valley and our ADU construction page.
Solar. Civil Code 714 voids restrictions that "effectively prohibit or restrict" a solar energy system. Reasonable restrictions are allowed if they do not "significantly increase the cost of the system or significantly decrease its efficiency." An HOA must approve or deny in writing, and the statute says that if it does not deny in writing "within 45 days from the date of receipt of the application," the application is deemed approved, unless the delay came from a reasonable request for more information. (Civil Code 714)
San Dimas: the HOA stamp comes before the city
San Dimas's Plan Checking page tells HOA homeowners to get "their approval stamp on plans before submittal to City," and to "check your deed restrictions (CC&Rs) and HOA requirements before submitting for plan check." (San Dimas Plan Checking)
The practical result: the HOA gets the same drawings the city will get, so what the HOA approves has to match what you submit. If the plans change after the HOA's stamp, ask the HOA whether it needs to see the new version. The page we read says nothing about a city-run design review. More on the city's rules is in our San Dimas permit guide.
Azusa: Planning's Design Review comes first
Azusa's permit page puts Planning at the front of the line: "Before you do anything else, you must check with the Planning Division to determine if a Design Review approval is required." It continues: "If the Design Review is required, you will need to complete this process before submitting a Building Permit application." If it is not required, "you may submit your application to the Building Section." (Azusa Building Permit Process)
The page does not list which projects need Design Review, so we will not guess. Interior kitchen and bath work rarely raises the question. Exterior changes and additions can. Call Planning before you pay for drawings. Our Azusa permit guide has the city's other rules, including the 180-day clock on the permit.
Claremont: preservation review for historic resources
Claremont's Cultural Resource Preservation page describes an ordinance that would "apply Citywide to all properties, structures, landscapes, and sites" that are listed on a local, state or national register or qualify for designation. It would "establish procedures for reviewing actions to alter, relocate, demolish, or otherwise impact historic and cultural resources." (Claremont Cultural Resource Preservation)
One caution. The page we read calls the ordinance "proposed" and describes 2024 hearings. It does not give an adoption date or say what homeowners must do today, so we cannot tell you the review is in force or what it requires. Whether your address is a historic resource, and what review applies to your work, is a question for Planning at (909) 399-5460.
Interior kitchen and bath work is not what these reviews are aimed at. Exterior work on an older house is. Our Claremont permit guide has the permit list.
Mills Act: a question to ask the city
The California Office of Historic Preservation calls the Mills Act "the single most important economic incentive program in California" for preserving historic buildings. Local governments can contract with owners of qualified historic properties, who get property tax relief in return for maintaining the property's historic character. (California OHP, Mills Act)
- "Mills Act contracts are between the property owner and the local government." The state is not a party.
- Not every city offers it. OHP says to contact the city or county official for your jurisdiction about eligibility and how to apply.
- OHP says contracts run ten years at minimum, renew each year and pass to later owners.
We did not find, on the city pages we read, whether San Dimas, Azusa or Claremont offer it. Ask Planning. We do not give tax advice.
Inside work versus outside work
The pattern across the pages we read: these reviews are about what the street and the neighbors can see. They are not a second inspection of your kitchen.
- Usually outside the city reviews: interior kitchen and bath work with no change to the outside. Azusa's interior work rarely raises Design Review, and Claremont's page ties its review to historic resources. Your HOA's documents may still say otherwise, so check.
- Often triggers a look: new or moved windows and doors, a new roofline or roof material, a changed facade or color, an addition. See windows and doors in a remodel and our exterior renovations page.
- ADUs and garage conversions: state law limits what an HOA can refuse, and the city has its own rules. A listed historic house adds a preservation question. See garage conversion vs detached ADU.
- Fireplace and chimney changes: if the chimney is visible from outside, ask the HOA. See fireplace reface or rebuild.
Before you apply
- Get the HOA's written procedure and its list of changes that need approval. Civil Code 4765 requires the HOA to give members notice of both each year.
- Call Planning with your address. Ask two things: is design review required for this work, and is the house a historic resource.
- Bring the same drawings and material list to each office. Our design is in-house, so the drawings can match across all three.
- Keep every approval and denial in writing. Civil Code 4765 says the HOA's decision must be.
- Put the approvals in your contract. Our scope section shows how we write the work down. Any change after approval goes through a written change order.
Get a written, fixed-price quote or call Dallas at (626) 991-8219. Your written quote has the schedule.
Questions we get
Does my HOA have to answer my application?
It has to follow a written procedure. Civil Code 4765 says the procedure "shall provide for prompt deadlines" and must "state the maximum time for response," and that "A decision on a proposed change shall be in writing." If the answer is no, the written decision has to say why and how to ask the board to reconsider. Get your HOA's own procedure before you apply.
Can my HOA stop me from building an ADU?
Not by a blanket ban. Civil Code 4751 makes a restriction that effectively blocks or unreasonably limits an ADU or junior ADU "void and unenforceable" on a single-family lot. HCD adds that an HOA "may impose some limited objective standards," such as materials or style, as long as they do not unreasonably raise the cost or effectively prohibit the unit.
Do I need HOA approval for a kitchen or bath remodel inside the house?
That depends on your HOA's governing documents, which we have not seen. Civil Code 4765 applies where those documents "require association approval before a member may make a physical change." Read yours, and ask the HOA in writing if interior work is unclear. The city side is separate: San Dimas, Azusa and Claremont all aim their extra reviews at exterior work.
Is my house a historic resource?
Only your city can tell you. In Claremont, call Planning at (909) 399-5460 with your address and ask whether it is on a local, state or national register or qualifies. In the other cities we serve, we did not find a published historic review on the pages we read, so ask Planning the same question.
What is the Mills Act?
The California Office of Historic Preservation calls it "the single most important economic incentive program in California" for preserving historic buildings. Local governments contract with owners of qualified historic properties, and the contract is between you and your city or county. Whether your city offers it, and whether your house qualifies, is a question for the city.
Note: general background, not legal advice or an approval plan for your house. Your HOA's governing documents and your city decide what applies. Confirm with the HOA, your city and your contract.
Sources
All pages opened and read November 13, 2026. Rules and times change. Confirm with your HOA, your city and your contract.
Every source, with the date we read it
California law and HCD
- California Civil Code section 4765 (design review procedure for associations): california.public.law, Civil Code 4765 (read November 13, 2026)
- California Civil Code section 4751 (ADUs and governing documents): california.public.law, Civil Code 4751 (read November 13, 2026)
- California Civil Code section 714 (solar energy systems): california.public.law, Civil Code 714 (read November 13, 2026)
- California HCD, Accessory Dwelling Unit Handbook (PDF), Homeowners Associations section: https://www.hcd.ca.gov/sites/default/files/docs/policy-and-research/adu-handbook-update.pdf (read November 13, 2026)
City pages and historic preservation
- City of San Dimas, Plan Checking: https://www.sandimasca.gov/departments/community_development/building_and_safety/plan_checking.php (read November 13, 2026)
- City of Azusa, Building Permit Process: https://azusaca.gov/118/Building-Permit-Process (read November 13, 2026)
- City of Claremont, Cultural Resource Preservation: https://www.claremontca.gov/Business-Development/Planning-and-Land-Use/Cultural-Resource-Preservation (read November 13, 2026)
- California Office of Historic Preservation, Mills Act: https://ohp.parks.ca.gov/?page_id=21412 (read November 13, 2026)